Professional Handoff and Decision-Making Framework
Nimpact's Role in the Decision Chain
The ultimate value of any environmental assessment is whether it informs better decisions. Nimpact is explicitly designed as a screening toolânot a replacement for licensed professionals, but a guide for when and where those professionals are actually needed.
Core Philosophy: Nimpact acts as a "check engine light" for waterfront properties. Just as your car's warning light tells you when to see a mechanic (not how to rebuild the engine), Nimpact tells you when to engage engineers, ecologists, and hydrologists.
The Traditional Assessment Problem
Before Nimpact, property developers and conservation authorities faced a dilemma:
The All-or-Nothing Trap
Option A: Commission full professional assessments for ALL sites ($50k-100k+ per site)
Result: Prohibitive cost, most assessments find "no concerns"âwasted resources
Option B: Skip assessments entirely, rely on visual inspection
Result: Miss critical risks, discover problems after construction begins, liability exposure
Nimpact breaks this false dichotomy by providing evidence-based triageâsorting sites into "low concern" (standard monitoring), "moderate concern" (enhanced setbacks), and "high concern" (professional assessment mandatory).
Risk-Based Decision Framework
Nimpact reports categorize findings into action tiers:
Risk Level
Criteria
Recommended Action
Low
Shoreline Risk < 0.10, Slope < 10%, Good water quality metrics
Standard local regulations and setbacks apply. No additional assessment needed.
Moderate
Risk 0.10-0.18, Slope 10-15%, Some elevated metrics
Enhanced setbacks recommended (30m minimum). Periodic monitoring. Consider professional review for major structures.
High
Risk > 0.18 (tidal/lake), > 0.30 (river), OR Slope > 15%, OR Bluff > 20m
Professional assessment REQUIRED. P.Eng (geotechnical) for stability. P.Geo for hydrogeology if needed.
Professional Handoff Package
When Nimpact identifies high-risk conditions, it provides engineers with a comprehensive data package:
GIS Export Package Contents
GeoJSON: Machine-readable format for web mapping (OpenLayers, Mapbox, Leaflet)
KML: Google Earth compatibleâ3D visualization with elevation data
CSV: Spreadsheet formatâstatistical analysis in Excel, R, Python
PDF Report: Print-ready document for regulatory submissions and client communication
Vision: In 5-10 years, satellite-based screening will be standard practice for ALL waterfront developmentânot just large projects. Nimpact is pioneering this future, demonstrating that space-based data can democratize environmental due diligence.
Content Page - Ready for Quiz
đ Quiz
Question 1: What is Nimpact's primary role in environmental assessment?
A. A screening tool that identifies which sites need expensive professional assessmentâthe 'check engine light' for properties
B. To replace all professional engineers and eliminate field work
C. A final engineering report for regulatory approval
Question 2: What does the GIS export package include and why is it valuable?
A. Only coordinates for Google Maps
B. GeoJSON, KML, and CSV formats with coordinates, historical data, and satellite imageryâsaves engineers 10-20 hours of preliminary data gathering
C. Just a PDF for printing
Question 3: If Nimpact identifies a site as 'high risk' (e.g., Shoreline Risk > 0.18), what should happen next?
A. Automatically reject any development at the site
B. Engage licensed professional engineer (P.Eng) for site-specific geotechnical assessmentâNimpact screens, professionals design solutions
C. Ignore it if the beach looks fine during a site visit